
17
Fieldware
®
Tools
98-05048 R3
BUILDING AN APPLICATION REPORT
You can build an Application Report based on an existing record le (.RCD). The Build Report application utilizes
existing Customer, Dealer, Product and Applicator proles generated by the Build Proles application.
To build an application report it is recommended that you rst select and view the record le (.RCD) the report is
based on. You can also select and view the associated eld boundary (.BND) le. Viewing the (.RCD) and (.BND)
les are not required, but it is very useful to view this data prior to generating a report to ensure that they are the
correct les (Figure 19).
Once you have the data displayed in the map view window (right side) of Map Manager, select Report - Swath XL
/ GuideLine 3.0 from the Build menu located in the Map Manager menu bar, see “The Build Menu” on page 15.
Once selected, the Report Generation dialog appears.
Figure 19: Viewing Data Prior to Building an Application Report
The Report generation dialog contains ve tabbed setup dialogs, Maps/Files, Field Conditions, Product Setup, Job
Setup, and Document Setup. Building a report is easy if you select each tab in order starting from the left (Maps/
Files) and ending at the right most tab (Document Setup). Each tabbed dialog is described in more detail below.
Comentarios a estos manuales